| View previous topic :: View next topic |
| Author |
Message |
vpsimpson Newbie

Joined: 04 Dec 2009 Posts: 1
|
Posted: Fri Dec 04, 2009 4:37 pm Post subject: Date Conversion Error after 10/30/2009. |
|
|
After 10/30/2009 the numerical value of the date repeats every two weeks. For example
B1=1*A1 and B2=1*A15 are equal when A1 is 11/1/2009 and A15 is 11/15/2009. Is this a problem with the date routines or am I doing something wrong? |
|
| Back to top |
|
 |
mercierb Power User

Joined: 04 Aug 2003 Posts: 74 Location: Brussels
|
Posted: Sun Dec 06, 2009 8:22 am Post subject: Re: Date Conversion Error after 10/30/2009. |
|
|
| vpsimpson wrote: | After 10/30/2009 the numerical value of the date repeats every two weeks. For example
B1=1*A1 and B2=1*A15 are equal when A1 is 11/1/2009 and A15 is 11/15/2009. Is this a problem with the date routines or am I doing something wrong? | Maybe you could tell us what B1 and B2 contains now. |
|
| Back to top |
|
 |
|